ABOUT
The basic specification | Unit of measure | Value | ||
---|---|---|---|---|
Length of line including: on channels on reservoirs on pump stations, pressure head pipe lines, ducker |
km km km km |
458 354 101 3 |
||
Statistical height of rising of water on a watershed of the rivers Shiderty and Nura |
m | 418 | ||
Pressure losses on channels, pump stations to a watershed | m | 35 | ||
Total pressure of water lifting | m | 453 | ||
Productivity of pump station | m3/sec | 76 | ||
Modern through put (capacity of the channel) |
m/n m3 a year | 1204,7 | ||
The established capacity of pump stations | Thousand kWt | 350 | ||
Water losses: filtration on evaporation |
m/n m3 a year |
70,77 199,73 |
Structure of buildings
The construction name | Unit of measure | Value | ||
---|---|---|---|---|
Pump stations of lifting | Pieces | 22 | ||
Pump stations of swapping of filtrational waters | Pieces | 4 | ||
Channels | Pieces | 34 | ||
Earthen damps | Pieces | 14 | ||
Partitioning off constructions | Pieces | 3 | ||
Spillways, water releases, differences | Pieces | 11 | ||
water through put pipes under the channel | Pieces | 6 | ||
Ducker | Pieces | 1 | ||
Bridge transitions through the channel (not including transitions pump stations) |
Pieces | 14 | ||
Highway with entrances to constructions | km | 511 | ||
Power lines: 220, 110, 35 and 6 kV | km | 628 | ||
Communication lines | km | 596 | ||
Settlements | Pieces | 3 |